Air Conditioning
Refrigeration
Heating & Plumbing
Chalcroft Special Projects
As part of an office refurbishment in London, Chalcroft Special Projects Ltd had to find the right partner to install two air conditioning units in a server room for their client.
As they wanted to be insitu within a week, timing of the project was essential. The client Soho Square describes itself as “8 floors and 43,000 sq ft of incredibly cool office space” such prestigious serviced offices deserved a computer cooling system to match.
Once the initial scoping had taken place Major Cooling & Heating Ltd sourced two top of the range DAIKIN units through their strong supplier network. Two Major engineers installed the units, completed the 75m pipe-run and commissioning all well within the deadline.
As with most central London projects, transporting equipment and parking can be problematic but this was resolved by the engineers commuting on a daily basis. This also cut overheads for overnight accommodation, ensuring we gave our clients the most flexible and cost effective solution to their project.
All of this was achieved with minimum disruption and will help maintain a reliable computer system throughout the building.
Alex Locke, Chalcroft’s Commercial Manager, said,
“Major Cooling & Heating were very easy to work with. They provided a quick professional response and tailored a system to our needs. The staff had a professional attitude, good knowledge and expertise and caused minimal disruption during the works. We look forward to working together with them on other future projects.”
Client
Project
Installing Server Room Air Conditioning
Sector
Information Technology
Contract Period
5 Working Days
Location
Soho Square, London
Benefits of working with Major Cooling
-
Technical assessment & advice
-
Sourcing the right equipment
-
Detailed Quotation
-
Tight deadlines met
-
Knowledge & expertise
-
Technical challenges included the 75m pipe run and the 30m vertical lift.
-
Flexible & Cost Effective solutions
-
Quality & assurance
Fully qualified F-Gas certified engineers with full CRB checks.
“Major Cooling & Heating were very easy to work with. They provided a quick professional response and tailored a system to our needs. The staff had a professional attitude, good knowledge and expertise and caused minimal disruption during the works. We look forward to working together with them on other future projects.”
Alex Locke, Chalcroft’s Commercial Manager
Need help with your next cooling or heating project?
Call us on! 01386 858 251